The 3d Model
Build 3 beams to support the Refuge.
We received all the wood the first day. It arrived with a truck that we hired. For the 3 main beams we used 2″ x 10″ x 3,2 mt.(10.5 ft.) pine wood plank. The main beams are 5,5 (18 ft.) mt, long so we had to composed each beam with 6 of this planks. We used 3″ screws to attach them together. We protected the wood with cutex.
Fix Beams to floor and Paint Floor beams.
Construct the floor structure.
Nailing pre floor and building 1st wall structure.
Building the rest of the wall’s structures.
Finishing walls details and building ceiling beams.
Protecting wood and building ceiling 1st layer.
Finishing ceiling and closing walls.